Installation Guide
Table Of Contents
- Disclaimers
- Support and Contact Information
- Revision History
- Contents
- HANDLING AND SAFETY INSTRUCTIONS
- IMPORTANT SAFETY INSTRUCTIONS
- Chapter 1: Introducing the SolarEdge Power Harvesting System
- Chapter 2: Installing the Power Optimizers
- Chapter 3: Installing the Inverter
- Chapter 4: Connecting the AC and the Strings to the Safety Switch
- Chapter 5: Commissioning the Installation
- Chapter 6: User Interface
- Chapter 7: Setting Up Communication
- Appendix A: Errors and Troubleshooting
- Appendix B: Mechanical Specifications
- Appendix C: External Fan Maintenance and Replacement
- Appendix D: Replacing and Adding System Components
- Appendix E: Determining the Circuit Breaker Size
- Technical Specifications - Single Phase Inverters (North America)
- Technical Specifications - Three Phase Inverters (North America)

or otherwise altering the construction of the enclosure, as this may
compromise safety and will void the warranty.
Reference to horizontal mounting application note
Updated clearance specifications and added link for annual-average
high temperature database
Connection to/from the Safety Switch:
AC grounding to bus bar instead of terminal block - updated
instructions and Safety Switch model images
String fusing requirement note updated:Fuses needed for 4 strings or
more (instead of 3).
Added conduit sealing requirement
In Commissioning chapter:
Updated the activation sequence
Updated menu information descriptions
Removed RS232 reference
Rapid shutdown (PVRSS):
Added important safety information notes and warnings
For a compliant PV Rapid Shutdown installation, use no more than 30
optimizers per string.
Enabling PVRSS from the inverter menu is only required if the installed
optimizers were manufactured before 2015, otherwise it is enabled by
default.
Added testing PVRSS functionality after pairing
In Configuration Menu Options:
Communication section:
Removed RS232 Conf
Added GSMConf
Power Control section:
Removed Phase Balance link and info
Added a note about compliance with UL 1741 Supplement A.
Add link to P(Q) diagram application note
Maintenance section:
-Three Phase System Installation Guide MAN-01-00002-4.3
6 Revision History