Installation Manual
Table Of Contents
- Disclaimers
- Contents
- HANDLING AND SAFETY INSTRUCTIONS
- Chapter 1: Overview
- Chapter 2: Installing the Power Optimizers
- Chapter 3: Installing the Inverter
- Chapter 4: Auto-transformer and Backed-up Loads Panel Installation (for Backup Only)
- Chapter 5: Electricity Meter Installation
- Chapter 6: StorEdge Inverter Connections
- Chapter 7: User Interface
- Chapter 8: Commissioning the Installation
- Chapter 9: System Configuration
- Chapter 10: Setting Up Communication to the Monitoring Portal
- Appendix A: Troubleshooting
- Appendix B: Replacing and Adding System Components
ConfiguringtheInverterUsingtheLCDUserButtons 40
ConfiguringtheInverterUsingtheLCDLightButton 43
ConfigurationMenuOptions 45
CountryandGrid 45
Language 45
Communication 45
PowerControl 47
Display 47
Maintenance 48
Information 48
StatusScreens-OperationalMode 49
InitialStatus 49
MainInverterStatus 49
EnergyMeterStatus 50
TelemetryStatus 50
IDStatus 51
ServerCommunicationStatus 51
IPStatus 51
ZigBeeStatus 51
CellularStatus 52
GSMStatus 52
CommunicationPortsStatus 52
SmartEnergyManagementStatus 53
PowerControlStatus 53
BatteryStatus 54
TimeOfUseStatus 54
Chapter 8: Commissioning the Installation 55
Step1:ActivatingtheSystem 55
Step2:PairingPowerOptimizerstotheInverter 58
Step3:VerifyingProperOperation 60
Step4:ReportingandMonitoringInstallationData 60
TheSolarEdgeMonitoringSystem 60
ProvidingInstallationInformation 61
PaperTemplate 61
SiteMapper 61
CreatingaSiteintheSolarEdgeMonitoringPortal 61
Chapter 9: System Configuration 62
ConfiguringtheRS485BusforBatteryandMeterConnection 62
ConfiguringStorEdgeApplication 65
MaximizeSelf-consumption 65
ProfileProgramming(fortimeofusearbitrage) 65
BackupPower 65
SystemConfiguration 65
VerifyingStorEdgeComponentsFunctionality 68
Chapter 10: Setting Up Communication to the Monitoring Portal 71
Contents
SolarEdge-StorEdge Installation Guide MAN-01-00262-1.0
3