Installation Manual
Table Of Contents
- Disclaimers
- Contents
- HANDLING AND SAFETY INSTRUCTIONS
- Chapter 1: Overview
- Chapter 2: Installing the Power Optimizers
- Chapter 3: Installing the Inverter
- Chapter 4: Auto-transformer and Backed-up Loads Panel Installation (for Backup Only)
- Chapter 5: Electricity Meter Installation
- Chapter 6: StorEdge Inverter Connections
- Chapter 7: User Interface
- Chapter 8: Commissioning the Installation
- Chapter 9: System Configuration
- Chapter 10: Setting Up Communication to the Monitoring Portal
- Appendix A: Troubleshooting
- Appendix B: Replacing and Adding System Components
Recommended
cable type (min-
max AWG)
StorEdge Con-
nection Unit
connection
Auto-transformer
connection
Connection method
Temperature Sensor
Temperature sensor
terminal
24 AWG (16-24 AWG),
300 Vrms insulated
External Devices 7-pin
terminal block: T1
Temperature sensor
terminal: T1
1
StorEdge Connection Unit: Press
the protrusion at the top of the
terminal block to open the
connection hole, insert the wire
and release to spring back and
clamp the wire.
Auto-transformer:
o
Insert a flat blade screwdriver
into the square opening at the
top of the terminal block and
press to open clamp
mechanism.
o
Insert the wire into the round
opening and release the
screwdriver to spring back and
clamp the wire.
External Devices 7-pin
terminal block: T2
Temperature sensor
terminal: T2
1
T1 and T2 are interchangable
Chapter 6: StorEdge Inverter Connections
SolarEdge-StorEdge Installation Guide MAN-01-00262-1.0