Installation Manual
Table Of Contents
- Disclaimers
- Contents
- HANDLING AND SAFETY INSTRUCTIONS
- Chapter 1: Overview
- Chapter 2: Installing the Power Optimizers
- Chapter 3: Installing the Inverter
- Chapter 4: Auto-transformer and Backed-up Loads Panel Installation (for Backup Only)
- Chapter 5: Electricity Meter Installation
- Chapter 6: StorEdge Inverter Connections
- Chapter 7: User Interface
- Chapter 8: Commissioning the Installation
- Chapter 9: System Configuration
- Chapter 10: Setting Up Communication to the Monitoring Portal
- Appendix A: Troubleshooting
- Appendix B: Replacing and Adding System Components
Mounting the Auto-transformer
1.
Determinethemountinglocation,onawall,studframingorpole.Toallowproperheatdissipation
andcableentry,maintainthefollowingminimumclearanceareasbetweentheauto-transformerand
otherobjects:
l 8in/200mmtothetopandbottomoftheauto-transformer;ifconduitentrytotheauto-
transformerwillbefromthebottom,leavesufficientclearancefortheconduitsaswell.
l 4in/100mmtotherightandleftoftheauto-transformer.
2. Installthebracketwiththeflatsidefacingdown.Verifythatthebracketisfirmlyattachedtothe
mountingsurface.
3. Hangtheauto-transformeronthebracket:Lifttheauto-transformerfromthesides,orholditatthe
topandbottomtolifttheunitintoplace.
4.
Insertthetwosuppliedscrewsthroughtheouterheatsinkfinonbothsidesoftheauto-transformer
andintothebracket.Tightenthescrewswithatorqueof4.0N*m/2.9lb.*ft.
Figure 14: Installing the auto-transformer
Installing the Backed-up Loads Panel
InstallasecondaryACpanelforbacked-uploads(notsuppliedbySolarEdge).Rewirethebacked-uploads
throughthispanel.
Installtwopoles25AmaincircuitbreakerwithintegratedAFCIonthispanel,toensurethe25Aphase
imbalancelimitismaintainedatalltimes.
Figure 15: Backed-up Loads Panel
Chapter 4: Auto-transformer and Backed-up Loads Panel Installation (for Backup Only)