Installation Manual
Table Of Contents
- Disclaimers
- Contents
- HANDLING AND SAFETY INSTRUCTIONS
- Chapter 1: Overview
- Chapter 2: Installing the Power Optimizers
- Chapter 3: Installing the Inverter
- Chapter 4: Auto-transformer and Backed-up Loads Panel Installation (for Backup Only)
- Chapter 5: Electricity Meter Installation
- Chapter 6: StorEdge Inverter Connections
- Chapter 7: User Interface
- Chapter 8: Commissioning the Installation
- Chapter 9: System Configuration
- Chapter 10: Setting Up Communication to the Monitoring Portal
- Appendix A: Troubleshooting
- Appendix B: Replacing and Adding System Components
2.
LoosenthescrewsonthefrontcoveroftheStorEdgeConnectionUnitusingthesuppliedAllenkey,as
shownbelow:
Figure 10: Opening the StorEdge Connection Unit cover
3. RemovetheStorEdgeConnectionUnitcover.
4.
Opentherequiredconduitknockoutsaccordingtotheconduitsusedintheinstallation(refertothe
figurebelowforrequiredknockouts;someoftheknockoutsmayalreadybeopenbutsealed):The
knockoutsarelocatedatthebottomoftheenclosure,eachwithtwosizes:¾''and1''.Openthe
requiredknockouts,takingcarenottointerferewithanyoftheinternalcomponents.AUnibitdrill
maybeused.
Figure 11: StorEdge Connection Unit knockouts
NOTE
Unused conduit openings and glands should be sealed with appropriate seals.