Energy Hub with Prism Technology Installation Guide
Table Of Contents
- Disclaimers
- Revision History
- HANDLING AND SAFETY INSTRUCTIONS
- IMPORTANT SAFETY INSTRUCTIONS
- Chapter 1: Overview
- Chapter 2: Installing the Power Optimizer
- Chapter 3: Installing the Inverter
- Chapter 4: Installing the Battery
- Chapter 5: Connecting the Inverter
- Chapter 6: Activating, Commissioning and Configuring the System
- Chapter 7: Setting Up Communication to the Monitoring Platform
- Appendix A: Errors and Troubleshooting
- Appendix B: Mechanical Specifications
- Appendix C: Replacing and Adding System Components
- Appendix D: Powering the LG Chem Battery Off and On
- Single Phase Energy Hub Inverter with Prism Technology - Technical Specificat...
- Support Contact Information
Figure 22: EVCharger Connection
4. Open Communication gland 2 and pass the communication cable through the
gland.
5. Connect the communication cable to the 3-pin connector labeled SMRTEVRS485.
Installing the 9V Battery
A 9V battery is supplied with the inverter to enable the inverter to start production in
case of a power outage.
To install the 9V battery:
1.
Connect the snap-on clip to the battery contacts.
2.
Insert the battery into the battery holder in the Connection Unit.
Single Phase Energy Hub Inverter with Prism Technology MAN-01-00671-1.3
42 Installing the 9V Battery