SE6000HD-US Installation Manual
Table Of Contents
- Disclaimers
- Revision History
- HANDLING AND SAFETY INSTRUCTIONS
- IMPORTANT SAFETY INSTRUCTIONS
- Chapter 1: Introducing the SolarEdge Power Harvesting System
- Chapter 2: Installing the Power Optimizers
- Chapter 3: Installing the Inverter
- Chapter 4: Connecting the AC and the Strings to the Safety Switch
- Chapter 5: Activating, Commissioning and Configuring the System
- Chapter 6: Setting Up Communication to the Monitoring Platform
- Appendix A: Errors and Troubleshooting
- Appendix B: Mechanical Specifications
- Appendix C: Replacing and Adding System Components
- Technical Specifications - Single Phase Inverters with HD-Wave Technology (No...
- Support Contact Information
Figure 13: Opening the Safety Switch cover
3. Remove the Safety Switch cover.
4.
Open the required AC and DC conduit drill guides according to the conduits used in
the installation: The drill guides are located at the bottom and sides of the
enclosure, each with two sizes: ¾'' and 1''. Open the required drill guides, taking
care not to interfere with any of the internal components. It is recommended to use
a Unibit drill.
Figure 14: Safety Switch drill guides
NOTE
Unused conduit openings and glands should be sealed with appropriate
seals.
Chapter 3: Installing the Inverter 31
Single Phase Inverter with HD-Wave Technology Installation MAN-01-00541-1.4