SE6000HD-US Installation Manual
Table Of Contents
- Disclaimers
- Revision History
- HANDLING AND SAFETY INSTRUCTIONS
- IMPORTANT SAFETY INSTRUCTIONS
- Chapter 1: Introducing the SolarEdge Power Harvesting System
- Chapter 2: Installing the Power Optimizers
- Chapter 3: Installing the Inverter
- Chapter 4: Connecting the AC and the Strings to the Safety Switch
- Chapter 5: Activating, Commissioning and Configuring the System
- Chapter 6: Setting Up Communication to the Monitoring Platform
- Appendix A: Errors and Troubleshooting
- Appendix B: Mechanical Specifications
- Appendix C: Replacing and Adding System Components
- Technical Specifications - Single Phase Inverters with HD-Wave Technology (No...
- Support Contact Information
Indication
ON/ OFF/
P
Switch
Position
LEDColor
Comment
Red Green Blue
Inverter
configuration
or reboot
ON / P ON ON ON
Inverter
firmware
upgrade
ON / P Alternating Alternating Alternating
The upgrade
process can take
up to 5 minutes
Error Any ON
ON/ OFF/
Blinking/
Flickering
ON/ OFF /
Blinking
Refer to
Errors
and
Troubleshooting
on page 62
The following table describes production percentage of AC information by LED color
and ON/OFF/P switch position.
Indication
ON/
OFF/ P
Switch
Position
LEDColor
Comment
Red Green Blue
Percentage of AC
Production:
0 %
ON (1)
OFF OFF OFF
This indicates
power
production as
percentage of
rated peak AC
output power
Percentage of AC
Production:
0 - 33 %
OFF ON OFF
Percentage of AC
Production:
33 - 66 %
OFF OFF ON
Percentage of AC
Production:
66 - 100 %
OFF ON ON
Opening Conduit Drill Guides
This step may be performed before or after mounting the inverter.
To open conduit drill guides:
1. Move the Safety Switch ON/OFF/P switch and the inverter ON/OFF/P switch to OFF.
2.
Loosen the screws on the front cover of the Safety Switch, as shown below:
Single Phase Inverter with HD-Wave Technology Installation MAN-01-00541-1.4
30 Opening Conduit Drill Guides