Installation Guide

Addition of possibility to use compatible connectors from third-party
manufacturers
Update regarding use of extension cables in power optimizer installation
guidelines
Recommendation to mount the power optimizer in a location protected
from direct sunlight
Addition of caution - installation in saline environment
Addition of link to the Designer web page
Updated warning about sealing unused power optimizer input
connectors
Output safe voltage is 1V (±0.1V)
Changed Connection Unit cover torque size to 10.3 N*m
Mounting and Connecting the Primary and Secondary Unit(s) section
and procedure , step 10, modified sub step a to 'Position the cable so
that the arrows are facing you'
Version 1.1 - Editorial updates (March 2018)
Modified DC Knockout to drill guide
Modified 'To connect t ACand ground' procedure
Changed inverter name
Modified step 4 -in 'To open the conduit drill guides' procedure
Changed inverter name to Three Phase Inverter with synergy technology
Version 1 - (February 2018)
Version History 7
Three Phase Inverter with Synergy Technology Installation MAN-01-00401-1.5