Installation Guide

CPU Version: The communication board firmware version
DSP 1/2 Version: The digital board firmware version
NOTE
Please have these numbers ready when you contact SolarEdge Support.
Serial Number - The inverter serial number as appears on the enclosure sticker
Hardware IDs: Displays the following HW serial numbers (if exist, and
connected to the inverter):
This inverter: the inverter's ID
Meter # : Energy meter ID (up to 3 meters can be connected)
ZB: ZigBee Plug-in MAC address
Cell: MEID (CDMA) or IMEI (GSM)
Error Log: Displays the last five errors, and enables resetting (clearing) the log.
Warning Log: Displays the last five warnings, and enables resetting (clearing)
the log.
Step 3: Verifying Proper Activation and
Commissioning
1. Select Information and verify that the correct firmware versions are installed on each
inverter.
2. Select Status and verify that inverter is operating and producing power (see also
Viewing System Status
on page 58).
3. Verify that the number of paired optimizers is the same as the number of physically
installed power optimizers.
4. Verify that additional configurations were properly set by viewing the relevant
Status screens.
5. Verify that the green inverter LEDis steadily lit.
Your SolarEdge power harvesting system is now operational.
Chapter 5: Activating, Commissioning and Configuring the System Using the
Inverter SetApp 57
Three Phase Inverter with Synergy Technology Installation MAN-01-00401-1.5