Installation Guide

NOTE
The Server menu shows only the communication options installed in the
inverter.
For detailed information about all the configuration options, refer to the
Communication Options Application Note
, available on the SolarEdge
website at https://www.solaredge.com/sites/default/files/solaredge-
communication_options_application_note_v2_250_and_above.pdf.
Power Control
Power control options are detailed in the
Power Control Application
Note
, available on the SolarEdge website at .
The Grid Control option may be disabled. Enabling it opens additional
options in the menu.
The Energy Manager option is used for setting power export limitation,
as described in the
Export Limitation Application Note
, available on the
SolarEdge website at https://www.solaredge.com/sites/default/files/export_
limitation_application_note_NA.pdf.
For P(Q) diagram refer to
https://www.solaredge.com/sites/default/files/application_note_p_q_diagram_of_
se_inverters_en_and_na.pdf.
NOTE
SolarEdge inverters with Grid Support functionality (as marked on the
inverter certification label), are compliant with UL1741 Supplement A. The
functionality is built into the inverter and no additional external device is
required.
Device Manager
From the Commissioning menu, select Device Manager to configure various system
Smart Energy Management devices.
Chapter 5: Activating, Commissioning and Configuring the System Using the
Inverter SetApp 55
Three Phase Inverter with Synergy Technology Installation MAN-01-00401-1.5