Installation Guide

4.
Insert the cable through the ACdrill guide that was opened.
NOTE
Connect the equipment grounding before connecting the AC wires to the
AC terminal block.
Veillez à relier le conducteur de PE (la terre) avant de connecter les fils CA
au bornier CA.
5. Connect the grounding wire to the grounding terminal block and tighten with a
torque of
15N*m / 12 lb*ft.
6.
Remove the screws from the AC terminal blocks.
NOTE
Apply heat shrink insulation to the lug barrels.
7.
Crimp the lugs on the AC wires.
CAUTION!
Only use compression lugs of the one -hole standard barrel 600v type . Do
not use mechanical lugs (chair lugs) as they may pose a safety risk.
Three Phase Inverter with Synergy Technology Installation MAN-01-00401-1.5
46 Connecting the AC Grid and Grounding to the Connection Unit