Installation Guide
a. Lift the Primary Unit from its sides.
b. Align the two indentations in the enclosure with the two triangular mounting
tabs of the bracket, and lower the unit until it rests on the bracket evenly (see
Figure 20
).
c. Insert the supplied screw through the right side of the heat sink and into the
bracket.
Figure 20: Hanging units
7.
Mount the Secondary Unit(s):
There is no specific order for hanging the Secondary Units.
When installing a 2 unit inverter, mount the Secondary Unit to the left of
the Primary Unit.
Lift the Secondary Unit(s) from the sides, or hold it at the top and bottom
of the unit to lift into place.
Align the two indentations in the enclosure with the two triangular
mounting tabs of the bracket, and lower the unit until it rests on the
bracket evenly (see
Figure 20
).
Insert one of the supplied screws through the outer side of the heat sink
and into the bracket. Tighten the screws with a torque of 4.0N*m / 2.9
lb.*ft.
8.
Secure the Connection Unit to the wall:
Three Phase Inverter with Synergy Technology Installation MAN-01-00401-1.5
40 Mounting and Connecting the Primary and Secondary Unit(s)