Installation Guide
Figure 18: Brackets spacing
If you are using the level:
a. Drill two holes for each bracket and mount the brackets.
b.
Place the level beneath the brackets and align the brackets, tighten the screws
all the way and verify that the brackets are firmly attached to the mounting
surface.
Figure 19: Aligning the brackets
c. Position the mounting brackets against the wall and mark the required drilling
holes locations with the supplied level. The level markings correspond to a
distance of 3 cm between units.
d. Put in the screws without tightening in order to correct positioning.
4. Mount the Primary Unit bracket and put in the screws.
5. Tighten the Primary Unit screws all the way and verify that the bracket is firmly
attached to the mounting surface.
6.
Mount the Primary Unit:
Chapter 3: Installing the Primary and Secondary Unit(s) 39
Three Phase Inverter with Synergy Technology Installation MAN-01-00401-1.5