Installation Guide
3 cycle RMS - the integral on 3-cycle duration
Default Trip Limits and Times According to IEEE1547
NOTE
The inverters are equipped with adjustable utility protective function set-
points, and can be aggregated above 30kW on a single Point of Common
Connection. The default settings are in compliance with IEEE1547. Utility
authorization is required to change these set-points.
Voltage Range (% of Base Voltage) Max. Clearing Time (Sec)
V < 50% 0.16
50 % < V < 88% 2.00
110% < V < 120 1.00
V > 120 % 0.16
Frequency Range (Hz) Max. Clearing Time (Sec)
> 60.5 0.16
< 59.3 (Hawaii – 57) 0.16
Connection Unit
Specifications 66.6kW and 100kW Unit
Maximum DC voltage 500 DC to GND
A
4
8
1
0
0Maximum DC current 66k: 2 x40 0k: 3 x40A A
Va
d
c
c
Nominal AC voltage
Maximum AC current 66.6k: 80A 100k: 120A Aac
Ambient temperature
-
-
4
4
0
0
t
t
o
o
1
+
40
6
0
/
°F /°C
Weight 6.6/3.0 lb/kg
-Three Phase Inverter with Synergy Technology Installation MAN-01-00401-1.5
106 Default Trip Limits and Times According to IEEE1547