Install Manual

Table Of Contents
Step 2: Commissioning and Configuring the Installation 46
Step 3: Verifying Proper Activation and Commissioning 48
Configuring Communication with Other Devices 48
Running a Battery Self-test 49
Enabling StorEdge Applications 50
Reporting and Monitoring Installation Data 51
Chapter 7: Setting Up Communication to the Monitoring Platform 54
Communication Options 54
Communication Connectors 56
Removing the Inverter Cover 56
Removing the Connection Unit Cover 57
Creating an Ethernet (LAN) Connection 57
Verifying the Connection 60
Appendix A: Errors and Troubleshooting 61
Identifying Errors 61
Energy Hub Inverter Troubleshooting 62
Troubleshooting Communication 63
Power Optimizer Troubleshooting 64
Appendix B: Mechanical Specifications 66
Appendix C: Replacing and Adding System Components 67
Replacing an Inverter 67
Adding, Removing, or Replacing Power Optimizers 69
Appendix D: Powering the LG Chem Battery Off and On 71
Single Phase Energy Hub Inverter with Prism Technology - Technical
Specifications 72
Support Contact Information 77
Revision History 5
Single Phase Energy Hub Inverter with Prism Technology MAN-01-00671-1.2