Install Manual
Table Of Contents
- Disclaimers
- Revision History
- HANDLING AND SAFETY INSTRUCTIONS
- IMPORTANT SAFETY INSTRUCTIONS
- Chapter 1: Overview
- Chapter 2: Installing the Power Optimizer
- Chapter 3: Installing the Inverter
- Chapter 4: Installing the Battery
- Chapter 5: Connecting the Inverter
- Chapter 6: Activating, Commissioning and Configuring the System
- Chapter 7: Setting Up Communication to the Monitoring Platform
- Appendix A: Errors and Troubleshooting
- Appendix B: Mechanical Specifications
- Appendix C: Replacing and Adding System Components
- Appendix D: Powering the LG Chem Battery Off and On
- Single Phase Energy Hub Inverter with Prism Technology - Technical Specificat...
- Support Contact Information
Communication Connectors
Opening for cable size (diameter) Connection type
2.5 - 5 mm RS485
4.5 - 7 mm, with cut Ethernet (CAT5/6)
2 - 4 mm, with cut
Antenna cable for wireless
communication
The communication board has the following connectors:
Standard RJ45 terminal block for Ethernet connection
USB
RS485 connector
The SolarEdge Wi-Fi antenna, ZigBee or Cellular Plug-ins can be connected to the
communication board for optional wireless connection.
Figure 25: Communication board connectors
Removing the Inverter Cover
1. Switch the inverter ON/OFF/P switch to OFF. Wait 5 minutes for the capacitors to
discharge.
Single Phase Energy Hub Inverter with Prism Technology MAN-01-00671-1.2
56 Communication Connectors