Install Manual
Table Of Contents
- Disclaimers
- Revision History
- HANDLING AND SAFETY INSTRUCTIONS
- IMPORTANT SAFETY INSTRUCTIONS
- Chapter 1: Overview
- Chapter 2: Installing the Power Optimizer
- Chapter 3: Installing the Inverter
- Chapter 4: Installing the Battery
- Chapter 5: Connecting the Inverter
- Chapter 6: Activating, Commissioning and Configuring the System
- Chapter 7: Setting Up Communication to the Monitoring Platform
- Appendix A: Errors and Troubleshooting
- Appendix B: Mechanical Specifications
- Appendix C: Replacing and Adding System Components
- Appendix D: Powering the LG Chem Battery Off and On
- Single Phase Energy Hub Inverter with Prism Technology - Technical Specificat...
- Support Contact Information
To start using StorEdge applications, you first need to enable the Backup Configuration
functionality (disabled by default). If Backup Configuration is disabled, the system will
use the battery energy in the following cases:
When PV production is not sufficient in MSC
When using one of charge/discharge profiles that requires battery discharge
However stored energy will not be used to back up the loads in case of power outage.
To enable Backup Configuration:
Open SetApp and select Commissioning > Power Control > Energy Manager >
Backup Configuration > Backup > Enable.
After the Backup Configuration is enabled, the Backup Interface is automatically
configured.
To enable a StorEdge application:
1. Select Power Control > Energy Manager > Energy Control.
2.
Select one of the following applications:
Backup only - Set the system to supply power to backed-up loads only in case
of a power outage.
Time of use - Set a charge/discharge profile and the level of charging the
battery from AC.
Maximum Self Consumption (MSC) - Set the system to maximize self-
consumption, and then the level of stored energy to be reserved for backup.
Reporting and Monitoring Installation Data
NOTE
Monitoring the site requires connecting the inverter to the monitoring
platform, using any of the wired or wireless options available from SolarEdge.
Refer to
Setting Up Communication to the Monitoring Platform
on page 54.
The Monitoring Platform
The monitoring platform provides enhanced PV performance monitoring and yield
assurance through immediate fault detection and alerts at the panel, string and system
level.
Chapter 6: Activating, Commissioning and Configuring the System 51
Single Phase Energy Hub Inverter with Prism Technology MAN-01-00671-1.2