Install Manual
Table Of Contents
- Disclaimers
- Revision History
- HANDLING AND SAFETY INSTRUCTIONS
- IMPORTANT SAFETY INSTRUCTIONS
- Chapter 1: Overview
- Chapter 2: Installing the Power Optimizer
- Chapter 3: Installing the Inverter
- Chapter 4: Installing the Battery
- Chapter 5: Connecting the Inverter
- Chapter 6: Activating, Commissioning and Configuring the System
- Chapter 7: Setting Up Communication to the Monitoring Platform
- Appendix A: Errors and Troubleshooting
- Appendix B: Mechanical Specifications
- Appendix C: Replacing and Adding System Components
- Appendix D: Powering the LG Chem Battery Off and On
- Single Phase Energy Hub Inverter with Prism Technology - Technical Specificat...
- Support Contact Information
Figure 23: Installing the 9V Battery
3. Close the Connection Unit covers with the Allen screws.
Connecting Multiple Inverters through RS485
You can add inverters to your system to increase on-grid and backup power
production. Up to two additional Single phase inverters with HD-Wave technology or
Energy Hub inverters may be connected to a single Energy Hub inverter.
If a battery and Backup Interface are installed, the ACoutput from the additional
inverters must be connected to the Backup Interface. Use a circuit breaker (CB-UPG-xx-
01) purchasable from SolarEdge. For more information, refer to the
Backup Interface
Installation Guide
.
When connecting multiple inverters, use the following cable types:
Communication - 24 AWG (16-24AWG), 600V insulated or CAT5
12V- RSD cable- 16 AWG cable
To connect an additional Energy Hub inverter:
1. On both inverters, pass the communication cable through Communication gland 2.
2.
On the first inverter, connect the cable to the 2nd Inv RS485 connector.
Chapter 5: Connecting the Inverter 43
Single Phase Energy Hub Inverter with Prism Technology MAN-01-00671-1.2