Install Manual

Table Of Contents
Figure 22: EVCharger Connection
4. Open Communication gland 2 and pass the communication cable through the
gland.
5. Remove the 6-pin connector from the RS485 1/2 port on the communication board.
6. Connect the communication cable wires to the 6-pin connector.
Installing the 9V Battery
A 9V battery is supplied with the inverter to enable the inverter to start production in
case of a power outage.
To install the 9V battery:
1.
Connect the snap-on clip to the battery contacts.
2.
Insert the battery into the battery holder in the Connection Unit.
Single Phase Energy Hub Inverter with Prism Technology MAN-01-00671-1.2
42 Installing the 9V Battery