Install Manual
Table Of Contents
- Disclaimers
- Revision History
- HANDLING AND SAFETY INSTRUCTIONS
- IMPORTANT SAFETY INSTRUCTIONS
- Chapter 1: Overview
- Chapter 2: Installing the Power Optimizer
- Chapter 3: Installing the Inverter
- Chapter 4: Installing the Battery
- Chapter 5: Connecting the Inverter
- Chapter 6: Activating, Commissioning and Configuring the System
- Chapter 7: Setting Up Communication to the Monitoring Platform
- Appendix A: Errors and Troubleshooting
- Appendix B: Mechanical Specifications
- Appendix C: Replacing and Adding System Components
- Appendix D: Powering the LG Chem Battery Off and On
- Single Phase Energy Hub Inverter with Prism Technology - Technical Specificat...
- Support Contact Information
NOTE
Functional electrical earthing of DC-side negative or positive poles is prohibited
because the inverter has no transformer. Grounding (earth ground) of panel
frames and mounting equipment of the PV array panels is acceptable.
NOTE
SolarEdge’s fixed input voltage architecture enables the parallel strings to be of
different lengths. Therefore, they do not need to have the same number of
power optimizers, as long as the length of each string is within the permitted
range.
To connect to DCstrings:
1.
Strip 5.16''/8 mm of the DC wires insulation.
2. Pass the DCwires through the conduit.
3.
Connect the wires to the DCterminals as shown below. Observe the correct polarity
as labeled on the terminals.
Figure 18: Inverter DC Connections
Single Phase Energy Hub Inverter with Prism Technology MAN-01-00671-1.2
38 Connecting the DC Strings to the Inverter