Install Manual
Table Of Contents
- Disclaimers
- Revision History
- HANDLING AND SAFETY INSTRUCTIONS
- IMPORTANT SAFETY INSTRUCTIONS
- Chapter 1: Overview
- Chapter 2: Installing the Power Optimizer
- Chapter 3: Installing the Inverter
- Chapter 4: Installing the Battery
- Chapter 5: Connecting the Inverter
- Chapter 6: Activating, Commissioning and Configuring the System
- Chapter 7: Setting Up Communication to the Monitoring Platform
- Appendix A: Errors and Troubleshooting
- Appendix B: Mechanical Specifications
- Appendix C: Replacing and Adding System Components
- Appendix D: Powering the LG Chem Battery Off and On
- Single Phase Energy Hub Inverter with Prism Technology - Technical Specificat...
- Support Contact Information
Figure 1: Energy Hub system components
NOTE
Additional SolarEdge inverters (without batteries) can be connected over
RS485. The inverters will participate in export limitation, Smart Energy
Management and backup operation.
PV modules connected to power optimizers are not mandatory for charge/
discharge profile programming.
Installation Equipment List
Standard tools can be used during the installation of the SolarEdge system. The
following is a recommendation of the equipment needed for installation:
Allen screwdriver for 5mm screw type for the inverter enclosure screws
Chapter 1: Overview 13
Single Phase Energy Hub Inverter with Prism Technology MAN-01-00671-1.2