Installation Manual

Step 1: Activating the System
1. VerifythattheinverterON/OFFswitchisOFF.
2. VerifythattheConnectionUnitON/OFFswitchisintheOFFposition.
3.
Removetheinvertercover:Opentheinvertercover’ssixAllenscrewsandcarefullypullthecover
horizontallybeforeloweringit.
WARNING!
ELECTRICAL SHOCK HAZARD. Do not touch uninsulated wires when the inverter cover is
removed.
RISQUE D’ÉLECTROCUTION, ne touchez pas les fils non isolés lorsque le couvercle de
l'onduleur est retiré.
4.
Activatetheinverter:
a. VerifythatthecardS/NmatchestheinverterS/N.
b. Insertthecardintothe"CARD"slotonthecommunicationboard.
c. TurnONtheACswitchofthemaincircuitboard.
d. LCDshows:Running Script...è Done!
Figure 28: Activation card
IfLCDshows:Failed:
l TurnACOFFandON(reset),andrepeattheactivationprocess.
l Usetheactivationcodethatappearsonthecertificationinverterlabeltomanuallyactivatethe
inverter.
l Iftheproblempersists,contactSolarEdgeSupport.
NOTE
Youcanusetheactivationcodethatappearsonthecertificationinverterlabelto
activatetheinverterincaseofascripterrororamissingactivationcard.
SolarEdge-StorEdge Installation Guide MAN-01-00262-1.3
46
Step 1: Activating the System