Installation Manual

Step 3: Connecting Power Optimizers in Strings
Youcanconstructparallelstringsofunequallength,thatis,thenumberofpoweroptimizersineach
stringdoesnothavetobethesame.Theminimumandmaximumstringlengthsarespecifiedinthe
poweroptimizerdatasheets.RefertotheSolarEdgeSiteDesignerforstringlengthverification.
1. ConnecttheMinus(-)outputconnectorofthestring’sfirstpoweroptimizertothePlus(+)output
connectorofthestring’ssecondpoweroptimizer.
2.
Connecttherestofthepoweroptimizersinthestringinthesamemanner.
Figure 6: Power optimizers connected in series
3.
Ifyouintendtomonitortheinstallation,usingtheSolarEdgemonitoringplatform,recordthe
physicallocationofeachpoweroptimizer,asdescribedinProvidingInstallationInformationonpage51.
WARNING!
Input and output connectors are not watertight until mated. Open connectors should be mated to
each other or plugged with appropriate watertight caps.
Les connecteurs d’entrée et sortie ne sont pas étanches jusqu'à ce qu’ils soient accouplés. Les
connecteurs doivent être accouplés ou fermés avec des terminaux étanches.
SolarEdge-StorEdge Installation Guide MAN-01-00262-1.3
18
Step 3: Connecting Power Optimizers in Strings