Install Manual
Table Of Contents
- Disclaimers
- Revision History
- Contents
- HANDLING AND SAFETY INSTRUCTIONS
- IMPORTANT SAFETY INSTRUCTIONS
- Chapter 1: Introducing the SolarEdge Power Harvesting System
- Chapter 2: Installing the Power Optimizer
- Chapter 3: Installing the Inverter
- Chapter 4: Connecting the AC and the Strings to the Safety Switch
- Chapter 5: Activating, Commissioning and Configuring the System
- Chapter 6: Setting Up Communication to the Monitoring Platform
- Appendix A: Errors and Troubleshooting
- Appendix B: Mechanical Specifications
- Appendix C: External Fan Maintenance and Replacement
- Appendix D: Replacing and Adding System Components
- Determining the Circuit Breaker Size
- Support Contact Information
SE9KUS SE10KUS SE14.4KUS SE20KUS SE30KUS SE33.3KUS Units
ADDITIONAL FEATURES
Supported communication
interfaces
2 x RS485, Ethernet, Built-in GSM (Optional)
Inverter Commissioning With the SetApp mobile application using built-in Wi-Fi station for local connection
Rapid Shutdown – NEC 2014 and
2017 690.12
Automatic Rapid Shutdown upon ACgrid disconnect
(1)
RS485 Surge Protection Supplied with the inverter
Smart Energy Management Export Limitation
STANDARD COMPLIANCE
Safety
Grid connection standards
Emissions
UL1741, UL1741 SA, UL1699B, CSA
2
2.2, Canadian AFCIaccording to T.I.L. M-07
IEEE1547, Rule 21, Rule 14 (HI)
FCC part15 class A
RoHS Yes
INSTALLATION SPECIFICATIONS
AC output conduit size / AWG
range
3/4”
minimum /
12-6 AWG
3/4”
minimum /
12-6 AWG
3/4”
minimum /
8-4 AWG
3/4”
minimum /
12-6 AWG
3/4”
minimum /
8-4 AWG
3/4”
minimum /
8-4 AWG
DC input conduit size / # of
inputs/ AWG range
3/4” minimum / 12-6 AWG
4
(1)
P/N SE9K-US0xxxxxx has Manual Rapid Shutdown for NEC2014 compliance (NEC 2017 compliance with outdoor
installation)
Three
Phase
Inverter
Specifications
(North America)
MAN-01-00529
-1.3