Install Manual
Table Of Contents
- Disclaimers
- Revision History
- Contents
- HANDLING AND SAFETY INSTRUCTIONS
- IMPORTANT SAFETY INSTRUCTIONS
- Chapter 1: Introducing the SolarEdge Power Harvesting System
- Chapter 2: Installing the Power Optimizer
- Chapter 3: Installing the Inverter
- Chapter 4: Connecting the AC and the Strings to the Safety Switch
- Chapter 5: Activating, Commissioning and Configuring the System
- Chapter 6: Setting Up Communication to the Monitoring Platform
- Appendix A: Errors and Troubleshooting
- Appendix B: Mechanical Specifications
- Appendix C: External Fan Maintenance and Replacement
- Appendix D: Replacing and Adding System Components
- Determining the Circuit Breaker Size
- Support Contact Information
Table 1: Circuit Breaker Criteria
Inverter
Max. Continuous Output Current
(per Phase)
Recommended
Circuit Breaker
SE12.5K 20A 25A
SE14.4KUS
40A 50A
SE15K 23A 32A
SE16K 25.5A 32A
SE17K 26A 32A
SE25K 38A 50A
SE27.6K 40A 50A
SE30KUS 36.5A 50A
SE33.3K 40A 50A
SE43.2KUS
120A 150A
SE50K 76A 100A
SE55K 80A 100A
SE66.6K 80A 100A
SE66.6KUS
80A 100A
SE75K 120A 150A
SE82.8K 120A 150A
SE100K 120A 150A
SE100KUS
120A 150A
Determining the Circuit Breaker Size 83
Three Phase System Installation Guide MAN-01-00527-1.4