Install Manual
Table Of Contents
- Disclaimers
- Revision History
- Contents
- HANDLING AND SAFETY INSTRUCTIONS
- IMPORTANT SAFETY INSTRUCTIONS
- Chapter 1: Introducing the SolarEdge Power Harvesting System
- Chapter 2: Installing the Power Optimizer
- Chapter 3: Installing the Inverter
- Chapter 4: Connecting the AC and the Strings to the Safety Switch
- Chapter 5: Activating, Commissioning and Configuring the System
- Chapter 6: Setting Up Communication to the Monitoring Platform
- Appendix A: Errors and Troubleshooting
- Appendix B: Mechanical Specifications
- Appendix C: External Fan Maintenance and Replacement
- Appendix D: Replacing and Adding System Components
- Determining the Circuit Breaker Size
- Support Contact Information
Step 2: Commissioning and Configuring the Installation 49
Step 3: Verifying Proper Activation and Commissioning 51
Reporting and Monitoring Installation Data 51
Designer 53
Mapper Application 53
Physical Layout Editor 53
Using a Paper Template 54
55
55
57
58
58
58
63
66
67
67
68
69
71
72
72
72
75
75
76
79
80
80
81
Chapter 6: Setting Up Communication to the Monitoring Platform
Communication Options
Communication Connectors
Removing the Inverter Cover
Removing the DC Safety Unit Cover (if applicable)
Creating an Ethernet (LAN) Connection
Creating an RS485 Bus Connection
Verifying the Connection
Appendix A: Errors and Troubleshooting
Identifying Errors
Troubleshooting Communication
Power Optimizer Troubleshooting
Appendix B: Mechanical Specifications
Appendix C: External Fan Maintenance and Replacement
Fan Maintenance
External Fan Replacement
Appendix D: Replacing and Adding System Components
Replacing an Inverter
Replacing the Safety Switch
Adding, Removing, or Replacing Power Optimizers
Determining the Circuit Breaker Size
Using Transformers in Commercial Three Phase Inverter Installations
Determining the Size of an Inverter Circuit Breaker
Contents 5
Three Phase System Installation Guide MAN-01-00527-1.4