Install Manual
Table Of Contents
- Disclaimers
- Revision History
- Contents
- HANDLING AND SAFETY INSTRUCTIONS
- IMPORTANT SAFETY INSTRUCTIONS
- Chapter 1: Introducing the SolarEdge Power Harvesting System
- Chapter 2: Installing the Power Optimizer
- Chapter 3: Installing the Inverter
- Chapter 4: Connecting the AC and the Strings to the Safety Switch
- Chapter 5: Activating, Commissioning and Configuring the System
- Chapter 6: Setting Up Communication to the Monitoring Platform
- Appendix A: Errors and Troubleshooting
- Appendix B: Mechanical Specifications
- Appendix C: External Fan Maintenance and Replacement
- Appendix D: Replacing and Adding System Components
- Determining the Circuit Breaker Size
- Support Contact Information
Power Control
Power control options are detailed in the
Power Control Application
Note
, available on the SolarEdge website at .
The Grid Control option may be disabled. Enabling it opens additional
options in the menu.
The Energy Manager option is used for setting power export limitation,
as described in the
Export Limitation Application Note
, available on the
SolarEdge website at
https://www.solaredge.com/sites/default/files/export_limitation_
application_note_NA.pdf.
For P(Q) diagram refer to
https://www.solaredge.com/sites/default/files/application_note_p_q_
diagram_of_se_inverters_en_and_na.pdf.
NOTE
SolarEdge inverters with “Grid Support” functionality (as marked on the
inverter certification label), are compliant with UL1741 Supplement A. The
functionality is built into the inverter and no additional external device is
required.
Step 3: Verifying Proper Activation and
Commissioning
1. Select Information and verify that the correct firmware versions are installed on each
inverter.
2. Select Status and verify that inverter is operating and producing power.
3. Verify that additional configurations were properly set by viewing the relevant
Status screens.
4. Verify that the green inverter LEDis steadily lit.
Your SolarEdge power harvesting system is now operational.
Reporting and Monitoring Installation Data
Monitoring the site requires connecting the inverter to the monitoring platform, using
any of the wired or wireless options available from SolarEdge. Refer to
Setting Up
Communication to the Monitoring Platform
on page 55.
Chapter 5: Activating, Commissioning and Configuring the System 51
Three Phase System Installation Guide MAN-01-00527-1.4