Install Manual

Table Of Contents
Figure 25: DC Spring-clamp terminal – 14.4kW and 33.3kW inverters
5. Close the Safety Switch cover: Attach the switch cover and secure it by tightening
the four screws with a torque of 1.2 N*m / 0.9 ft.*lb.
6. Ensure proper conduit sealing; inspect the entire conduit run and use standard
conduit sealants to avoid water penetration.
Chapter 4: Connecting the AC and the Strings to the Safety Switch 47
Three Phase System Installation Guide MAN-01-00527-1.4