Install Manual
Table Of Contents
- Disclaimers
- Revision History
- Contents
- HANDLING AND SAFETY INSTRUCTIONS
- IMPORTANT SAFETY INSTRUCTIONS
- Chapter 1: Introducing the SolarEdge Power Harvesting System
- Chapter 2: Installing the Power Optimizer
- Chapter 3: Installing the Inverter
- Chapter 4: Connecting the AC and the Strings to the Safety Switch
- Chapter 5: Activating, Commissioning and Configuring the System
- Chapter 6: Setting Up Communication to the Monitoring Platform
- Appendix A: Errors and Troubleshooting
- Appendix B: Mechanical Specifications
- Appendix C: External Fan Maintenance and Replacement
- Appendix D: Replacing and Adding System Components
- Determining the Circuit Breaker Size
- Support Contact Information
3.
Connect the wires as follows:
1. Use a standard flat-blade screwdriver to connect the wires to the spring-clamp
terminals (See
Figure 23
).
2. The screwdriver blade should fit freely in the terminal opening. Too large a blade
can crack the plastic housing.
3. Insert the screwdriver, press the release mechanism and open the clamp.
4.
Insert the wire into the round opening and remove the screwdriver – the wire is
automatically clamped.
ד
Figure 23: AC Spring-clamp terminal – 9kW, 10kW, 20kW inverter
Three Phase System Installation Guide MAN-01-00527-1.4
44 Connecting the AC Grid to the Safety Switch