Install Manual

Table Of Contents
Revision History
Version 1.4 (August 2020)
Updated the communication board TCPdetails in
Creating an Ethernet (LAN)
Connection
on page 58.
Changed the cable type required for the RS485 and Ethernet connection to CAT6.
Added the requirement for a special bracket, when installing close to the shoreline
in
Mounting the Inverter
on page 34.
For inverter clearance, added a link to
Application Note - Clearance Guidelines
in
Mounting the Inverter
on page 34.
Added a requirement to minimize the distance between the positive and negative
DC optimizer cables in
Step 3: Connecting Power Optimizers in Strings
on page 24.
Version 1.3 (June 2020)
Modified the procedure for disconnecting the DC power and deleted the
introduction in the Safe DC Appendix.
Activating, Commissioning and Configuring updated.
The inverter can be connected in parallel with a generator.
Modified Power Optimizer Guidelines section: Length of home - run cabels
maximum values , Extension cables rules, Power optimizer clearance
Modified RS485 terminology - Master is now Leader and Slave is Follower,
respectively
Updated SetApp menu options
Revision History 3
Three Phase System Installation Guide MAN-01-00527-1.4