Install Manual
Table Of Contents
- Disclaimers
- Revision History
- Contents
- HANDLING AND SAFETY INSTRUCTIONS
- IMPORTANT SAFETY INSTRUCTIONS
- Chapter 1: Introducing the SolarEdge Power Harvesting System
- Chapter 2: Installing the Power Optimizer
- Chapter 3: Installing the Inverter
- Chapter 4: Connecting the AC and the Strings to the Safety Switch
- Chapter 5: Activating, Commissioning and Configuring the System
- Chapter 6: Setting Up Communication to the Monitoring Platform
- Appendix A: Errors and Troubleshooting
- Appendix B: Mechanical Specifications
- Appendix C: External Fan Maintenance and Replacement
- Appendix D: Replacing and Adding System Components
- Determining the Circuit Breaker Size
- Support Contact Information
Step 1: Mounting and Grounding the Power
Optimizers
For each of the power optimizers
(1)
:
1. Determine the power optimizer mounting location and use the power
optimizer mounting brackets to attach the power optimizer to the
support structure (See
Figure 4
). It is recommended to mount the
power optimizer in a location protected from direct sunlight. For
frame-mounted power optimizers follow the instructions supplied
with the optimizers, or refer to
https://www.solaredge.com/sites/default/files/installing_frame_mounted_power_
optimizers.pdf.
2.
If required, mark the mounting hole locations and drill the hole.
CAUTION!
Drilling vibrations may damage the power optimizer and will void the
warranty. Use a torque wrench or an electric drill with adjustable clutch that
meets the mounting torque requirements.
Do not
use impact drivers for
mounting the power optimizer.
Do not
drill through the power optimizer or through the mounting holes.
ATTENTION!
Les vibrations résultant du perçage peuvent endommager l’optimiseur de
puissance et annulera la garantie. Utilisez une clé dynamométrique ou une
perceuse électrique avec embrayage adaptable compatible avec les
moments indiqués. Ne pas utiliser des tournevis à percussion pour fixer
l’optimiseur. Ne pas percer à travers l’optimiseur de puissance ou ses trous
de fixation.
3.
Attach each power optimizer to the rack using M6 (1/4'') stainless steel bolts, nuts
and washers or other mounting hardware. Apply torque of 9-10 N*m / 6.5-7 lb*ft.
For 3NA series power optimizes, SolarEdge recommends mounting the power
optimizer on a rail with the smooth side facing out, so that the power optimizer
body will prevent its rotation.
(1)
Not applicable to smart modules.
Chapter 2: Installing the Power Optimizer 21
Three Phase System Installation Guide MAN-01-00527-1.4