Install Manual

Table Of Contents
P860 and M1600 power optimizers
Figure 3: Power optimizer clearance
When installing modules in a confined space, for example, if installing Building-
integrated photovoltaic (BIPV) modules, ventilation measures may be needed to
ensure the power optimizers are not be exposed to temperatures outside their
specifications.
Three Phase System Installation Guide MAN-01-00527-1.4
20 Installation Guidelines