Installation Manual
DeviceID 1
SlaveDetect 3 Slaves
›
LongSlaveDetect 3 Slaves
›
SlaveList 3 Slaves
›
7. TochecktheslaveIDsandlastcommunicationtime,selectRS485-1èSlave List.
8. VerifytheconnectionofthemastertotheSolarEdgemonitoringplatform,asdescribedinthenext
section.
Verifying the Connection
Afterconnectingandconfiguringacommunicationoption,performthefollowingstepstocheckthat
theconnectiontothemonitoringserverhasbeensuccessfullyestablished.
1. IftheConnectionUnitcoverisnotclosed,closeit:AttachtheConnectionUnitcoverandsecureitby
tighteningthescrewswithatorqueof10.3N*m/7.5lb.*ft.Forpropersealing,firsttightenthecorner
screwsandthenthetwocentralscrews.
2.
AccesstheStatusscreen:
a. IfnotalreadyON-turnONACtotheinverterbyturningONthecircuitbreakeronthemain
distributionpanel.
b. IfnotalreadyON-movetheConnectionUnitswitchtotheONposition.
c.
OpenSetAppandfollowtheinstructionsonthescreen(scantheinverterbar-code;movethe
ON/OFF/PswitchtoPposition(forlessthan5sec)andrelease).
ThemobiledevicecreatesaWi-Ficonnectionwiththeinverteranddisplaystheinvertermain
Statusscreen.
Chapter 6: Setting Up Communication
Three Phase Inverter with synergy technology Guide MAN-01-00401-1.1
68