Installation Manual
Chapter 6: Setting Up Communication
Theinvertersendsthefollowinginformationtothemonitoringplatform:
l PoweroptimizerinformationreceivedviatheDCpowerlines(thePVoutputcircuit)
l Inverterinformation
l Informationofanyotherconnecteddevices
Thischapterdescribessettingupcommunicationbetween:
l theinverterandthemonitoringplatformthroughtheInternet(wired/wireless),orthroughacellular
connection
l multipleinvertersforamaster/slaveconfiguration
Communicationsetupisnotrequiredforpowerharvesting,howeveritisneededforusingtheSolarEdge
monitoringplatform.
NOTE
It is recommended to connect communication connections before connecting the AC, for easier
access to the communication board.
CAUTION!
When connecting the communication cables, make sure that the ON/OFF/P switch on the Connection
Unit is turned OFF, and the AC is turned OFF.
When configuring the communication parameters, make sure that the ON/OFF/P switch on the
Connection Unit is OFF, and the AC is turned ON.
Lors de la connexion des câbles de communication, assurez-vous que l'interrupteur MARCHE/ARRÊT
à la base de l'onduleur soit en position ARRÊT, et le CA est en position ARRÊT. Lors de la
configuration des paramètres de communication, assurez-vous que l'interrupteur MARCHE/ARRÊT
soit en position ARRÊT, et le CA est en position MARCHE.
Chapter 6: Setting Up Communication
Three Phase Inverter with synergy technology Guide MAN-01-00401-1.1
56