Installation Manual

3.
WhenPairing Completeisdisplayed,thesystemstartupprocessbegins:
SincetheinverterisON,thepoweroptimizersstartproducingpowerandtheinverterstarts
convertingAC.
WARNING!
When you turn ON the inverter ON/OFF/P switch, the DC cables carry a high voltage and the
power optimizers no longer output a safe 1V output.
Après avoir mis l'interrupteur ON/OFF/P de l'onduleur monophasé sur ON, les câbles DC portent
une haute tension et les optimiseurs de puissance ne rent plus la tension de sécurité de 1V.
WhentheinverterstartsconvertingpoweraftertheinitialconnectiontotheAC,theinverterenters
Wakeupmodeuntilitsworkingvoltageisreached.Thismodeisindicatedbytheflickeringgreen
inverterLED.
Whenworkingvoltageisreached,theinverterentersProductionmodeandproducespower.The
steadilylitgreeninverterLEDindicatesthismode.
4. TapOKtoreturntothemainmenu.
Three Phase Inverter with synergy technology Guide MAN-01-00401-1.1
41
Pairing