Installation Manual

Setting Country and Language
1.
FromtheCommissioningscreenselectCountry and Language.
CountryandLanguage
Co u nt r y
Ge r m a n y q
La ng u a g e
D e u t sc h (G e r m an y ) q
2.
FromtheCountrydrop-downlist,selecttherequiredcountrysetting.
WARNING!
The inverter must be configured to the proper setting in order to ensure that it complies with the
country grid code and functions properly with the country grids.
L'onduleur doit être configuré pour le pays approprié afin d'assurer un fonctionnement convenable
avec le seau de ce pays.
1. FromtheLanguagedrop-downlist,selectthelanguage.
2. TapOK.
Pairing
Onceallconnectionsaremade,allthepoweroptimizersmustbelogicallypairedtotheirinverter.The
poweroptimizersdonotstartproducingpoweruntiltheyarepaired.Thisstepdescribeshowtoassign
eachinvertertothepoweroptimizersfromwhichitwillproducepower.
Performthisstepwhenthemodulesareexposedtosunlight.Ifthestringlengthischangedorapower
optimizerisreplaced,repeatthepairingprocess.
1.
Fromthemainmenu,selectPairing.
Pairing
T a p t h e b u t t on be l ow t o s t a r t t he
p a i r i ng p r oce s s
S t a r t pa ir i ng
2. TapStart Pairing.
Chapter 5: Activating, Commissioning and Configuring the System Using SolarEdge
Three Phase Inverter with synergy technology Guide MAN-01-00401-1.1
40