Installation Manual
l Iftheinverterhasalreadybeenactivatedandcommissioned:
a. IfnotalreadyON-turnONACtotheinverterbyturningONthecircuitbreakeronthemain
distributionpanel.
b. IfnotalreadyON-movetheConnectionUnitswitchtotheONposition.
c.
OpenSetAppandfollowtheinstructionsonthescreen(scantheinverterbar-code;movethe
ON/OFF/PswitchtoPposition(forlessthan5sec)andrelease).
ThemobiledevicecreatesaWi-Ficonnectionwiththeinverteranddisplaystheinvertermain
Statusscreen.
Status
Inverter
SN 07318000C
Power
100 kW
Voltage
277 Vac
Frequency
60.9 Hz
P_OK: 138 of 141
Optimizers Connected
S_OK
Server Connected
Status
Production
Switch
ON
CosPhi
1.00
Limit
No Limit
Country
USA2
Voltage
850 Vdc
Temp
156 F
Fan
OK
Commissioning
d.
TapCommissioningatthebottomofthescreen.ThemainCommissioningmenuscreenis
displayed.
Inthemainmenus,tapthemenuredarrows(›)toperformthesystemcommissioningorconfiguration
task.TaptheBackarrow(‹)toreturntothepreviousmenu.
Thenextsectionsprovidemoreinformationaboutconfigurationoptions(inadditiontoCountry and
LanguageandPairing,describedinStep2:CommissioningandConfiguringtheInstallationonpage38).
Three Phase Inverter with synergy technology Guide MAN-01-00401-1.1
39
Step 2: Commissioning and Configuring the Installation