Installation Manual
o
CommuniationCable
o
DCCable
o
ACCable
l DC conduit entry:DCconduitforconnectingthePV
l DC drill guide:DCdrillguideforconnectingthePV
l AC drill guide entry :ACdrillguideforgridconnection
l Communication gland: forconnectionofcommunicationoptions.RefertoSettingUp
Communicationonpage56.
Secondary Unit Interface
Figure 14: Secondary Unit interface
l TheSecondaryunitsconnectorsareforconnectiontothePrimaryUnit:
o
DC (MC4) connectors:forconnectionofthePVinstallation
o
Communication connector:forcommunicationoptions
o
AC connector:forconnectionoftheAC
Opening Conduit Drill Guides
ThissectiondescribeshowtoopentheACandDCdrillguides.
Thisstepmaybeperformedbeforeoraftermountingtheinverter.
To open conduit drill guides:
1.
EnsurethattheConnectionUnitandinverterON/OFFswitcharesettoOFF.
Three Phase Inverter with synergy technology Guide MAN-01-00401-1.1
25
Secondary Unit Interface