Installation Guide
D e v i c e T y p e < M T R >
P r o t o c o l < W N >
D e v i c e I D < 1 >
C T R a t i n g < 5 A >
M e t e r F u n c . < P r o d >
4.
Verify:
Device Type è MTR
Protocol è SE
Device ID è 1
CT Rating è 5A
Meter Func.è Prod (production)
5.
Select Meter 2 and configure the external meter settings:
Select Device Type è Revenue Meter
Select Protocol èSE
Set Device ID: 2
Set the CT rating to the value that appears on the CT: CT Rating è <xxxxA>. The
default is 5 Amperes. If the displayed rating is 0 or you cannot change the value,
there is no communication with the meter. Check that the AC power to the
meter is on.
Select Meter Func.è Inv. Production, Site Production, Consumption, Export,
Import, or Export+Import.
Verifying the Meter Connection
To verify the Dual-Meter connection using SetApp, "Verifying Meter Connection using
SetApp" on the next page.
To verify the Dual-Meter connection using the device display, "Verifying Meter
Connection Using the Device Display" on the next page.
Appendix B: Installing Two Meters 37
Energy Meter with Modbus Connection MAN-01-00270-1.3