Installation Guide
To wire the meter:
Wire the meter in accordance with one of the connection diagrams below:
Split phase grid, see the figure
Split Phase Grid
on page 16
No-neutral grid, see the figure
No-Neutral Grid
on page 17
If you are connecting the meter to a
revenue grade inverter
(inverter with built-in
meter), refer to
Installing Two Meters
on page 35.
Figure 14: Split Phase Grid
NOTE
Clamp the CTconnected to L1 CT around the wire connected to ØL1.
Clamp the CTconnected to L2 CT around the wire connected to ØL2.
When clamping the CT around the conductor to be measured, make sure the
arrow is pointing towards the grid.
Energy Meter with Modbus Connection MAN-01-00270-1.3
16 Installing and Connecting the Meter










