Install Manual

2.
Loosenthe4Allenscrewsofthemeterenclosureandremovethecover.
Figure 7: Meter front view without cover
3. Carefullymovetheterminalblockend-stopstothesidesofthemeterandremovetheterminal
blocks.
4.
Openoneormoreconduitknockoutsaccordingtotheconduitsusedintheinstallation:Openthe
requiredknockout(s),eachwithtwosizes:¾''and1'',takingcarenottointerferewithanyofthe
internalcomponents.AUnibitdrillmaybeused.
CAUTION!
Use only knockouts located at the bottom, back and sides of the enclosure. Opening the top
knockouts may damage the protection rating of the enclosure.
Figure 8: Meter - rear view
5.
Mountthemeter:Attachthemeterenclosurebackbracketstothemountedbracketusingthefour
suppliedscrews.Tightenthescrewswithatorqueof9N*m/6.6lb*ft.
To install the CTs:
1. TurnoffACpowerbeforeclampingoncurrenttransformers.
2. InstalltheCTsaroundtheconductortobemeasured.Split-coreCTscanbeopenedforinstallation
aroundaconductor.AnyloncabletiemaybesecuredaroundtheCTtopreventaccidentalopening.
3. InstalltheCTwiththearrowpointingtothegridforconsumptionorexportmeasurement.
SolarEdge SolarEdge Electricity Meter Installation Guide MAN-01-00270-1.0
8
Installing and Connecting the Meter