Install Manual

Table Of Contents
Table 2: Energy Meter ID DIP Switches
RS485 Termination TERM 1 TERM 2
Terminated Down Down
Not Terminated (factory default) Up Up
Figure 12: ID and termination DIP switches
Figure 13: Meter connection
To connect the Energy Meter to the Smart EV Charger:
1. Connect one end of the communication cable to the Energy Meter, as explained in
the Energy Meter's installation guide.
2.
Remove the seal from one of the openings in the communication gland at the
bottom of the Smart EV Charger and insert the RS485 wires from the meter through
the opening (see
Figure 13
).
3.
Remove the 3-pin connector from the RS485-1 port on the communication board
(see
Figure 13
).
Appendix A: Professional Installer - Connecting the Smart EV Charger to an
Energy Meter 50
Smart EV Charger Installation MAN-01-00657-1.0