Install Manual
Table Of Contents
- Disclaimers
- Revision History
- Contents
- HANDLING AND SAFETY INSTRUCTIONS
- RISK OF FIRE AND ELECTRIC SHOCK PREVENTION IMPORTANT SAFETY INSTRUCTIONS
- Smart EV Charging Safety Instructions
- Chapter 1: Introduction to Smart EV Charger
- Chapter 2: Connectors and Interfaces
- Chapter 3: Configuring and Using Smart EV Charger with mySolarEdge
- Chapter 4: Charging Instructions
- Chapter 5: Professional Installer- Connecting the AC Directly to the Smart EV Charger
- Required Equipment
- Main Procedure
- Grid Connection Guidelines
- Setting the Circuit Breaker Ratings
- Supported AC Grids
- Removing the Smart EV Charger Covers
- Disconnecting the AC Plug
- Directly Connecting the AC Grid to the Smart EV Charger
- Connecting the Smart EV Charger to the Single phase inverter with HD-Wave tec...
- Closing the Smart EV Charger Covers
- Chapter 6: Professional Installer - Setting Up Communication
- Chapter 7: Processional Installer - Configuring and Using Smart EV Charger with SetApp
- Chapter 8: Errors and Troubleshooting
- Appendix A: Professional Installer - Connecting the Smart EV Charger to an Energy Meter
- Mechanical Specifications
- Technical Specifications - Smart EV Charger (North America)
- Support Contact Information
Chapter 7: Processional Installer - Configuring
and Using Smart EV Charger with SetApp
After installing the Smart EV Charger configure it, then enable charging and other
advanced features (e.g. scheduling, excess solar charging) with SetApp.
You can connect communication options at this stage, as described in
Professional
Installer - Setting Up Communication
on page 36.
You can download the SetApp from the Apple App Store and Google Play prior to
reaching the site.
Internet connection is required for the download and for the one-time registration,
however not required for using the SetApp.
Configuring the Smart EV Charger
1. Download and Follow the on- screen instructions to configure and use SetApp with
Smart EV Charger.
Configuring Communication Options
Communication settings can be configured only after communication connections are
complete. Refer to
Professional Installer - Setting Up Communication
on page 36.
To configure communication options:
1.
Tap the Communication menu to define and configure the following:
The communication option used by the Smart EV Charger to communicate with
the monitoring platform.
The communication option used to communicate between multiple SolarEdge
devices.
2.
Tap the Server red arrow to set the communication method to be used for
Chapter 7: Processional Installer - Configuring and Using Smart EV Charger
with SetApp 44
Smart EV Charger Installation MAN-01-00657-1.0