Install Manual

Table Of Contents
1. Verify that AC is on.
2. Use SetApp to access the Commissioning menu
3.
Select the following to configure the connection:
Server è LAN
RS485- è Protocol è SolarEdge Master
RS485- è Slave Detect
The system starts automatic detection of the slave devices connected to the master
inverter. The inverter should report the correct number of slaves. If it does not, verify
the connections and terminations.
4. To check the slave IDs and last communication time, select RS485- è Slave List.
5. Verify the connection of the master to the monitoring platform, as described in the
next section.
Verifying the Connection to the Monitoring Platform
After connecting and configuring a communication option, perform the following
steps to check that the connection to the monitoring server has been successfully
established.
To verify the connection to the monitoring platform:
1. Open SetApp and follow the instructions on the screen. The mobile device creates a
Wi-Fi connection with the Smart EV Charger and displays the main Commissioning
screen.
2. From the Commissioning menu select Status.
3.
Check that S_OK - Server Connected status appears in the main Smart EVCharger
section.
4.
Scroll down to the Communication section and check that the communication
options are as required. Refer to
Viewing Communication Status
on page 45.
Smart EV Charger Installation MAN-01-00657-1.0
43 Verifying the Connection to the Monitoring Platform