Install Manual
Table Of Contents
- Disclaimers
- Revision History
- Contents
- HANDLING AND SAFETY INSTRUCTIONS
- RISK OF FIRE AND ELECTRIC SHOCK PREVENTION IMPORTANT SAFETY INSTRUCTIONS
- Smart EV Charging Safety Instructions
- Chapter 1: Introduction to Smart EV Charger
- Chapter 2: Connectors and Interfaces
- Chapter 3: Configuring and Using Smart EV Charger with mySolarEdge
- Chapter 4: Charging Instructions
- Chapter 5: Professional Installer- Connecting the AC Directly to the Smart EV Charger
- Required Equipment
- Main Procedure
- Grid Connection Guidelines
- Setting the Circuit Breaker Ratings
- Supported AC Grids
- Removing the Smart EV Charger Covers
- Disconnecting the AC Plug
- Directly Connecting the AC Grid to the Smart EV Charger
- Connecting the Smart EV Charger to the Single phase inverter with HD-Wave tec...
- Closing the Smart EV Charger Covers
- Chapter 6: Professional Installer - Setting Up Communication
- Chapter 7: Processional Installer - Configuring and Using Smart EV Charger with SetApp
- Chapter 8: Errors and Troubleshooting
- Appendix A: Professional Installer - Connecting the Smart EV Charger to an Energy Meter
- Mechanical Specifications
- Technical Specifications - Smart EV Charger (North America)
- Support Contact Information
Supported ACGrids
The following figures illustrate grids that are supported by the Smart EV Charger.
Ground connection is required for all grids, as described in
Disconnecting the AC Plug
on page 26.
Note that in some cases L1 and L2 are not interchangeable. In such cases, L1 and L2
locations appear in the following drawing.
Figure 5: 240V AC grids supported by Smart EV Charger
Removing the Smart EV Charger Covers
The Smart EV Charger has two covers: a top cover and a bottom cover. You must
remove both covers to open the Smart EV Charger.
To remove the Smart EVCharger covers:
1.
Loosen the screws on the top cover (see the following figure) and remove it.
2. Loosen the screws of the bottom cover (see the following figure)and remove it as
well.
Chapter 5: Professional Installer- Connecting the AC Directly to the Smart
EVCharger 24
Smart EV Charger Installation MAN-01-00657-1.0