View Project Summary
In the Summary screen you can see an overview of the selected design, as
detailed below and shown in Figure 11.
Figure 11 – Summary
1 Project summary: STC power, max DC power at given location and
orientation, inverter active AC power and inverter apparent AC power.
2 Yearly energy: estimated yearly energy that the system will produce.
3 Project design: inverter, power optimizer and module quantity;
number of PV arrays defined; number of different orientations used;
phase balancing requirement.
4 Environmental data: the system’s environmental impact according to its
estimated energy.
5 Estimated monthly energy: graph displaying the estimated monthly
energy that the system will produce.
a. If the inverter is strongly over-sized and as a result there AC
energy is lost due to output power clipping, the monthly and
yearly values of energy lost due to clipping are displayed as
well, as a percentage of produced energy.
b. Check that if a yield factor appears, it is at a satisfactory value.
The yield factor indicates low energy production in multi-facet
installations due to low number of modules on a facet.