P400 Installation
Table Of Contents
- SolarEdge Installation Guide - North America Version 4.0
- Disclaimers
- Support and Contact Information
- Contents
- HANDLING AND SAFETY INSTRUCTIONS
- IMPORTANT SAFETY INSTRUCTIONS
- Chapter 1: Introducing the SolarEdge Power Harvesting System
- Chapter 2: Installing the Power Optimizers
- Chapter 3: Installing the Inverter
- Chapter 4: Connecting the AC and the Strings to the Safety Switch
- Chapter 5: Commissioning the Installation
- Chapter 6: User Interface
- Chapter 7: Setting Up Communication
- Appendix A: Errors and Troubleshooting
- Appendix B: Technical Specifications
- Appendix C: Mechanical Specifications
- Appendix D: External Fan Maintenance and Replacement
- Appendix E: Replacing and Adding System Components
- Appendix F: Inverter Arc Detection and Interruption
pinsandthesamecolorforallGpins.
6. ForcreatinganRS485bus-connectallB,AandGpinsinallinverters.Thefollowing
figureshowsthisconnectionschema:
Figure 40: Connecting the inverters in a chain
NOTE
Do not cross-connect B, A and G wires. Do not insert wires into RS485- 2 pins.
7. Tightentheterminalblockscrews.
8. Checkthatthewiresarefullyinsertedandcannotbepulledouteasily.
9. PushtheRS485terminalblockfirmlyallthewayintotheconnectorontherightsideof
thecommunicationboard.
10. TerminatethefirstandlastSolarEdgedevice(inverter/SMI/Controlandcommunication
gateway,etc.)inthechainbyswitchingaterminationDIP-switchinsidetheinvertertoON
(movetheswitchup).Theswitchislocatedonthecommunicationboardandismarked
SW7.