P400 Installation
Table Of Contents
- SolarEdge Installation Guide - North America Version 4.0
- Disclaimers
- Support and Contact Information
- Contents
- HANDLING AND SAFETY INSTRUCTIONS
- IMPORTANT SAFETY INSTRUCTIONS
- Chapter 1: Introducing the SolarEdge Power Harvesting System
- Chapter 2: Installing the Power Optimizers
- Chapter 3: Installing the Inverter
- Chapter 4: Connecting the AC and the Strings to the Safety Switch
- Chapter 5: Commissioning the Installation
- Chapter 6: User Interface
- Chapter 7: Setting Up Communication
- Appendix A: Errors and Troubleshooting
- Appendix B: Technical Specifications
- Appendix C: Mechanical Specifications
- Appendix D: External Fan Maintenance and Replacement
- Appendix E: Replacing and Adding System Components
- Appendix F: Inverter Arc Detection and Interruption
Communication Connectors
Twocommunicationglandsareusedforconnectionofthevariouscommunicationoptions.
Eachglandhasthreeopenings.Thetablebelowdescribesthefunctionalityofeachopening.
Unusedopeningsshouldremainsealed.
Gland# Opening Functionality Cable Size (diameter)
1 (PG16)
One small External antenna cable 2-4 mm
Two large
Ethernet connection (CAT5/6),
ZigBee, CDMA
4.5-7 mm
2 (PG13.5) All three RS485, power reduction 2.5-5 mm
Figure 32: Communication Glands
ThecommunicationboardhasastandardRJ45terminalblockforEthernetconnection,a9-pin
terminalblockforRS485connection,asshownbelow:
Figure 33: Internal connectors
SolarEdge-Installation Guide MAN-01-00002-4.0
72
Communication Connectors