P400 Installation
Table Of Contents
- SolarEdge Installation Guide - North America Version 4.0
- Disclaimers
- Support and Contact Information
- Contents
- HANDLING AND SAFETY INSTRUCTIONS
- IMPORTANT SAFETY INSTRUCTIONS
- Chapter 1: Introducing the SolarEdge Power Harvesting System
- Chapter 2: Installing the Power Optimizers
- Chapter 3: Installing the Inverter
- Chapter 4: Connecting the AC and the Strings to the Safety Switch
- Chapter 5: Commissioning the Installation
- Chapter 6: User Interface
- Chapter 7: Setting Up Communication
- Appendix A: Errors and Troubleshooting
- Appendix B: Technical Specifications
- Appendix C: Mechanical Specifications
- Appendix D: External Fan Maintenance and Replacement
- Appendix E: Replacing and Adding System Components
- Appendix F: Inverter Arc Detection and Interruption
Chapter 4: Connecting the AC and the Strings
to the Safety Switch
TheSafetySwitchdisconnectsallungroundedDCconductorsofthecircuittowhichitis
connectedincompliancewiththeNationalElectricCode,andspecificallyNEC690.35,which
addressesungroundedPVarrays.TheSafetySwitchisratedtothemaximumoperating
conditionsoftheinverter.
TheSafetySwitchesareequippedwithdifferenttypesofterminalblocks.
SafetySwitcheswithabuilt-inRevenueGradeMeter(RGM)areavailableaswell.
ThefollowingfiguresillustrateseveraloftheavailableSafetySwitches.
Figure 21: Inside the DC Safety Switch for single phase 3-7.6kW inverters
Chapter 4: Connecting the AC and the Strings to the Safety Switch
SolarEdge-Installation Guide MAN-01-00002-4.0
33